We are proud to highlight the exemplary work completed by Total Protection Group (TPG) at Potters Field Park in London. This comprehensive project involved removing the aged surface dressing and meticulously preparing the substrate to ensure optimal drainage and longevity.
Key aspects of the project included the reinstallation and reinforcement of kerb edgings, cobbled setts, and drainage systems. Moreover, TPG successfully installed a ‘Rhino Guard’ protection bollard, incorporating the necessary foundational works.
Surfacing Requirement
The project culminated with the application of 620m2 of our 3mm Scandinavian Addaset Resin Bound Gravel, providing a resilient and aesthetically pleasing walking surface. This undertaking not only enhances the park’s functionality but also its visual appeal.
We commend Total Protection Group for their dedication to quality and detail in this project.
Systems Used:
Client:
Private
Architect:
N/A